St James’s Hospital
Damvent Hybrid AHU
Delivering 100% Fresh Air to
St James’s Hospital
1st ever HTM compliant hybrid hospital specification
Health Technical Memoranda (HTMs) give comprehensive advice and guidance on the design, installation and operation of specialised building and engineering technology (such as a Damvent Hybrid AHU) used in the delivery of healthcare.
The focus of HTM guidance remains on healthcare-specific elements of standards, policies and up-to-date established best practice. They are applicable to new and existing sites, and are for use at various stages during the whole building lifecycle. We are so proud that our Damvent Hybrid AHU is now the first ever specified hybrid AHU that is HTM compliant and has been delivered to St. James’s Hospital for use in their new Cardiac Cath Lab.
Pre-Install Q&A Session
Prior to shipment from the factory, the Damvent Hybrid Air Handling Unit underwent a comprehensive functional demonstration during a factory witness test. This crucial step ensured that all stakeholders, could witness the unit in operation and grasp its functionality in real-world scenarios. The demonstration facilitated a Q&A session with the manufacturers, allowing participants to address any potential concerns or queries upfront, thus preemptively mitigating any issues that might arise during installation or operation. This proactive approach fostered a deeper understanding and smoother integration of the unit into the intended environment.
Damvent’s hybrid HVAC fresh air solution is suitable for every application where 100% fresh air is needed, by means of covering all possible air treatment processes. Using integrated heat pump technology for ultimate energy saving control. All units:
- Reduce your building’s carbon footprint
- Supply 100% fresh air
- Have both winter and summer mode calculations
Questions?
At Keane Environmental Ltd., we understand that every job, large or small, has its own challenges. We’d be delighted to work with you to find the correct solution for your building. If you’d like to hear more about this or any of our other projects, contact us today.
Consulting Engineers: Delap And Waller
Mechanical Contractor: Hybrid Engineering
Clients: St James’s Hospital
Suppliers: Keane Environmental Ltd.